The Al Faris Group excels in handling heavy loads due to its state-of-the-art equipment, extensive experience, and meticulous attention to safety protocols.
This amazing project showcases the move of two gas phase reactors weighing a 510 tons per unit.
Each item has a length of 37 meters with a width of 10.2 meters and a height of 9.5 meters.
To ensure the safe and efficient transportation of these behemoths, the experts used their top-of-the-line equipment by Cometto with a 4-file SPMT combination composed by a total of 44 axle units.
Al Faris managed this job thanks to their expertise, dedication, and state-of-the-art equipment that allow to conquer even the most challenging projects.
For Cometto, it’s always a pleasure to see how our technology helps to handle complex tasks with precision and excellence.
Date of publication: 05/2024